Kellen's Eagle Project

13-14 January 2007

4July_03_01.JPG (221270 bytes) 4July_03_02.JPG (207761 bytes) 4July_03_03.JPG (183838 bytes) 4July_03_04.JPG (190269 bytes) 4July_03_05.JPG (177617 bytes)
Waterproofing the shed sides The adults discuss the pier placement We're takin' a break! The roof starts to go up

Installing the roof rafters

4July_03_06.JPG (172482 bytes) 4July_03_07.JPG (199611 bytes) 4July_03_08.JPG (182586 bytes) 4July_03_09.JPG (183029 bytes) 4July_03_10.JPG (173178 bytes)
Nailing down the floor Pose for a picture There should be walls on this outhouse!! Applying the shingles

A finished tool shed (minus the door)

4July_03_06.JPG (172482 bytes) 4July_03_07.JPG (199611 bytes) 4July_03_08.JPG (182586 bytes) 4July_03_09.JPG (183029 bytes) 4July_03_10.JPG (173178 bytes)
Kellen directs the scouts Waterproofing the roof Watching over pier placement Digging the pier holes

Are they level?

4July_03_06.JPG (172482 bytes) 4July_03_07.JPG (199611 bytes) 4July_03_08.JPG (182586 bytes) 4July_03_09.JPG (183029 bytes) 4July_03_10.JPG (173178 bytes)
Screwing in the wall Attaching a corner Holding up a wall Making sure the walls are straight

Stopping for lunch

Click on the picture to view a larger image