Kellen's Eagle Project
13-14 January 2007
Waterproofing the shed sides
The adults discuss the pier placement
We're takin' a break!
The roof starts to go up
Installing the roof rafters
Nailing down the floor
Pose for a picture
There should be walls on this outhouse!!
Applying the shingles
A finished tool shed (minus the door)
Kellen directs the scouts
Waterproofing the roof
Watching over pier placement
Digging the pier holes
Are they level?
Screwing in the wall
Attaching a corner
Holding up a wall
Making sure the walls are straight
Stopping for lunch